Anonymous
Apr 13, 2026
Rating: 4/5
Good Quality
Material is solid and meets specs. Shipping was slightly delayed but product is worth it.
Description
Reviews
| Brand | - |
| Category | Industrial Small Parts / Bearings & Bushings |
| Origin | - |
| Material Composition | Oil-Impregnated Nylon / HDPE |
| Color Appearance | Natural White / Off-White |
| Hardness Rating | Shore D 75-80 |
| Operating Temp Max | 120°C (248°F) |
| Operating Temp Min | -40°C (-40°F) |
| Machining Tolerance | ±0.05 mm |
| Surface Texture | Smooth Machined Finish |
| Specific Gravity | 1.15 g/cm³ |
| Custom Options | Available (CAD Drawing Required) |
| Packaging Type | Industrial Carton with Protection |
Anonymous
Apr 13, 2026
Rating: 4/5
Good Quality
Material is solid and meets specs. Shipping was slightly delayed but product is worth it.
Anonymous
Mar 31, 2026
Rating: 5/5
Great for Pulleys
Using them on pulley sleeves, no slippage and very durable under continuous load.
Anonymous
Mar 22, 2026
Rating: 5/5
Perfect Custom Fit
Sent our drawings and they machined it perfectly. No need for rework on installation.
Anonymous
Mar 15, 2026
Rating: 5/5
Excellent Wear Resistance
These bushings have lasted longer than the metal ones we used previously. Great for high friction areas.
Anonymous
Feb 09, 2026
Rating: 5/5
Quiet Operation
Significant noise reduction in our conveyor system after switching to these nylon sleeves.
Q: Is additional lubrication required for these bushings?
A: No, the material is oil-impregnated which provides self-lubrication during operation.
Q: Is this material resistant to UV exposure?
A: Standard nylon has moderate UV resistance. For outdoor use, we recommend adding UV stabilizers.
Q: Can you cut these sleeves to custom lengths?
A: Yes, please contact us with your required dimensions for a custom quote.
Q: Do you provide CAD files for the standard sizes?
A: We can provide STEP files for standard dimensions upon request via email.
Q: What is the standard lead time for orders?
A: Standard sizes ship within 3 days. Custom machined parts take 5-7 business days.