Skip to main content
Home / Computer Hardware, Monitors & Peripherals / Solder-Free Long-Lead Thin-Film Pressure Sensor Module - Resistive Flexible Force-Sensitive Touch (FSR406/RPF6)

Attributes

Brand -
Category Electronic Components / Maker DIY / Computer Hardware, Monitors & Peripherals
Origin -
Sensor Type Resistive Force-Sensing Resistor (FSR)
Model Compatibility FSR406 / RPF6
Active Area Diameter 19 mm (0.75 inch)
Force Range 0.2 to 20 Newtons
Resistance Range 100k Ohm to 200 Ohm
Lead Length 100 mm (Flexible Flat Cable)
Termination Solder-Free Connector Ready
Operating Temperature -40°C to 85°C
Total Thickness 0.45 mm
Substrate Material Flexible Polyimide Film

5 reviews

A

Anonymous

Mar 25, 2026

Rating: 5/5

Great for robot grippers

Works perfectly for my robotic hand project. The long leads make integration easy without extra wiring.

A

Anonymous

Mar 23, 2026

Rating: 5/5

Reliable data

We used these in a university project. Consistent readings across multiple units.

A

Anonymous

Mar 22, 2026

Rating: 4/5

Good sensitivity

Sensitivity is good but calibration takes some time. Overall solid component for pressure mapping.

A

Anonymous

Feb 01, 2026

Rating: 4/5

Durable film

The film feels sturdy. Bending radius is acceptable for most applications.

A

Anonymous

Jan 19, 2026

Rating: 5/5

Easy to use

The solder-free aspect saved me a lot of time. Plugged right into my breadboard adapter.

5 FAQ

Q: What is the maximum force before damage?

A: We recommend staying within 20 Newtons to ensure longevity.

Q: Are the leads removable?

A: The leads are integrated into the film structure and cannot be removed.

Q: Can this be used with Arduino?

A: Yes, it works with any microcontroller using an analog input pin.

Q: Is it waterproof?

A: The sensor is moisture resistant but not fully waterproof for submersion.

Q: Do you sell the connector separately?

A: Yes, please check our accessories section for matching FSR connectors.

Explore your interests

View More
All Categories
Best Seller (30)
New List (30)
Purified Water Bucket Stand Inverted Water Dispenser Pump Simple Mineral Water Drinking Machine Press Pump

Purified Water Bucket Stand Inverted Water Dispenser Pump Simple Mineral Water Drinking Machine Press Pump

$10.80

New Children's Gouache Paint Brushes DIY Hand-Painted Graffiti Art Class Watercolor Acrylic Paint Brushes Bristle Round Tip Brush

New Children's Gouache Paint Brushes DIY Hand-Painted Graffiti Art Class Watercolor Acrylic Paint Brushes Bristle Round Tip Brush

$6.41

Natural Clear Quartz Fully Clean Untreated Faceted Round Rice Beads - For Women's Bracelets, Spacer Beads, and DIY Crafts

Natural Clear Quartz Fully Clean Untreated Faceted Round Rice Beads - For Women's Bracelets, Spacer Beads, and DIY Crafts

$6.63

Sponge Brushes for Kids' Crafts and Creative Painting - Student Art Stamping Tools, DIY Sponge Paintbrushes

Sponge Brushes for Kids' Crafts and Creative Painting - Student Art Stamping Tools, DIY Sponge Paintbrushes

$13.86

Jiuchenggong Liquan Ming Tang Dynasty Ouyang Xun Yao Mengqi Copybook, Regular Script Brush Calligraphy Workbook, 3 Volumes, 188 Pages

Jiuchenggong Liquan Ming Tang Dynasty Ouyang Xun Yao Mengqi Copybook, Regular Script Brush Calligraphy Workbook, 3 Volumes, 188 Pages

$17.90

Shaped Watercolor Paper Ticket Stubs - Blank Postage Stamp Bookmarks with Serrated Edges, Thickened 300g Premium Cotton Pulp, Fine Texture for Art Hand Painting, Easy Blending, High Absorbency, Wrinkle-Resistant - Perfect for Postcards and Creative Cards

Shaped Watercolor Paper Ticket Stubs - Blank Postage Stamp Bookmarks with Serrated Edges, Thickened 300g Premium Cotton Pulp, Fine Texture for Art Hand Painting, Easy Blending, High Absorbency, Wrinkle-Resistant - Perfect for Postcards and Creative Cards

$9.85

Naitong Automatic Retractable Air Hose Reel with PU Braided Hose for Pneumatic Tools and Car Detailing

Naitong Automatic Retractable Air Hose Reel with PU Braided Hose for Pneumatic Tools and Car Detailing

$119.00

Premium Wall-Mounted Aromatherapy Empty Bottle – 100ML Plastic Square Diffuser Bottle with Wall-Mount Adhesive Sticker

Premium Wall-Mounted Aromatherapy Empty Bottle – 100ML Plastic Square Diffuser Bottle with Wall-Mount Adhesive Sticker

$2.98

Leyingfang Floating Pen for Kids' Water Drawing, Colorful Water-Soluble Suspended Markers, Erasable Watercolor Pens

Leyingfang Floating Pen for Kids' Water Drawing, Colorful Water-Soluble Suspended Markers, Erasable Watercolor Pens

$13.80

Loose Rose Quartz Beads, Donghai Agate, Chalcedony, Jadeite, and Madagascar Pink Crystal for DIY Jewelry Making

Loose Rose Quartz Beads, Donghai Agate, Chalcedony, Jadeite, and Madagascar Pink Crystal for DIY Jewelry Making

$6.72

Expandable Stainless Steel Sink Rack, Multi-Function Kitchen Drain Board for Fruits, Vegetables, and Utensils

Expandable Stainless Steel Sink Rack, Multi-Function Kitchen Drain Board for Fruits, Vegetables, and Utensils

$14.90

Transparent Retainer Case Aligner Storage Box Portable Carry-On Squeeze Bag Orthodontic Appliance Rubber Band Cleaning Box

Transparent Retainer Case Aligner Storage Box Portable Carry-On Squeeze Bag Orthodontic Appliance Rubber Band Cleaning Box

$18.50

Transparent Data Cable Organizer Bag for Travel - Portable Multi-Use Visible Storage for Digital Chargers and Cable Management

Transparent Data Cable Organizer Bag for Travel - Portable Multi-Use Visible Storage for Digital Chargers and Cable Management

$7.36

Finished Seal Calligraphy Finished Stone Stamp Sellos Chines

Finished Seal Calligraphy Finished Stone Stamp Sellos Chines

$108.58

Chunfei Grocery Store Commuter Hard Fork Low-Beam Mountain Bike for Urban Roads, Suburbs, School, and Outings

Chunfei Grocery Store Commuter Hard Fork Low-Beam Mountain Bike for Urban Roads, Suburbs, School, and Outings

$2,247.00

6-Cavity Large Square French Flower DIY Soap Silicone Mold for Essential Oil and Milk Soap

6-Cavity Large Square French Flower DIY Soap Silicone Mold for Essential Oil and Milk Soap

$4.93

Home Balcony Vegetable Planter - Self-Watering Plastic Pot for Strawberries and Succulents

Home Balcony Vegetable Planter - Self-Watering Plastic Pot for Strawberries and Succulents

$28.00

Pressure Swing Adsorption Nitrogen Generator - High-Purity Nitrogen Device for Heat Treatment

Pressure Swing Adsorption Nitrogen Generator - High-Purity Nitrogen Device for Heat Treatment

$36,456.00

6-Cavity 3D Rose Silicone Mold for DIY Soap Making Heat-Resistant Non-Stick Large Size for Milk Soap and Essential Oil Soap

6-Cavity 3D Rose Silicone Mold for DIY Soap Making Heat-Resistant Non-Stick Large Size for Milk Soap and Essential Oil Soap

$5.80

Traditional Handmade Baby Teething Rattle Sheepskin Wooden Clapper Newborn Toy Intangible Cultural Heritage

Traditional Handmade Baby Teething Rattle Sheepskin Wooden Clapper Newborn Toy Intangible Cultural Heritage

$29.85

Manufacturer Supply ZSJC02 Film Splicing Table, Alignment Table, Film Inspection Table

Manufacturer Supply ZSJC02 Film Splicing Table, Alignment Table, Film Inspection Table

$4,484.00

Box-Type Oxygen Generator Export Equipment - Stable Nitrogen and Oxygen Production for Wastewater Treatment

Box-Type Oxygen Generator Export Equipment - Stable Nitrogen and Oxygen Production for Wastewater Treatment

$25,000.00

Wholesale Acrylic Paint Stick Set, 3ml x 12 Colors, Non-Toxic for Children's DIY and Street Art

Wholesale Acrylic Paint Stick Set, 3ml x 12 Colors, Non-Toxic for Children's DIY and Street Art

$2.01

Cheese Processing Equipment - Small Pasteurized Fresh Milk Production Line, Fully Automatic Cheese Making Machine

Cheese Processing Equipment - Small Pasteurized Fresh Milk Production Line, Fully Automatic Cheese Making Machine

$66,500.00

Household Mini Range Hood, Portable USB Desktop Smoke Extractor for Living Room Hot Pot & BBQ Odor Removal

Household Mini Range Hood, Portable USB Desktop Smoke Extractor for Living Room Hot Pot & BBQ Odor Removal

$41.00

Sanitary Grade Stainless Steel Low-Temperature Vacuum Single-Effect Falling Film Evaporator for Milk Powder and Juice Processing

Sanitary Grade Stainless Steel Low-Temperature Vacuum Single-Effect Falling Film Evaporator for Milk Powder and Juice Processing

$4,158.00

Chain Shortener & Lifting Rigging - Double Chain Hook Assembly for Overhead Cranes and Hoists

Chain Shortener & Lifting Rigging - Double Chain Hook Assembly for Overhead Cranes and Hoists

$130.00

Youlian Toast Shaping Machine Dough Molder Square Bread Shaper Bakery Equipment YSN-T380

Youlian Toast Shaping Machine Dough Molder Square Bread Shaper Bakery Equipment YSN-T380

$9,695.20

Michelin Tire 255/50R20 109V - Compatible with VW Teramont, Trumpchi GS8, AITO M7, Li Auto L7/L8/L9, and NIO ES6

Michelin Tire 255/50R20 109V - Compatible with VW Teramont, Trumpchi GS8, AITO M7, Li Auto L7/L8/L9, and NIO ES6

$550.00

Traditional Wooden Rattle with Sheepskin Head for Early Education Newborns Boys and Girls Visual Tracking Grip and Hearing Training

Traditional Wooden Rattle with Sheepskin Head for Early Education Newborns Boys and Girls Visual Tracking Grip and Hearing Training

$11.88