Skip to main content
Home / Computer Hardware, Monitors & Peripherals / Solder-Free Long-Lead Thin-Film Pressure Sensor Module - Resistive Flexible Force-Sensitive Touch (FSR406/RPF6)

Attributes

Brand -
Category Electronic Components / Maker DIY / Computer Hardware, Monitors & Peripherals
Origin -
Sensor Type Resistive Force-Sensing Resistor (FSR)
Model Compatibility FSR406 / RPF6
Active Area Diameter 19 mm (0.75 inch)
Force Range 0.2 to 20 Newtons
Resistance Range 100k Ohm to 200 Ohm
Lead Length 100 mm (Flexible Flat Cable)
Termination Solder-Free Connector Ready
Operating Temperature -40°C to 85°C
Total Thickness 0.45 mm
Substrate Material Flexible Polyimide Film

5 reviews

A

Anonymous

Mar 25, 2026

Rating: 5/5

Great for robot grippers

Works perfectly for my robotic hand project. The long leads make integration easy without extra wiring.

A

Anonymous

Mar 23, 2026

Rating: 5/5

Reliable data

We used these in a university project. Consistent readings across multiple units.

A

Anonymous

Mar 22, 2026

Rating: 4/5

Good sensitivity

Sensitivity is good but calibration takes some time. Overall solid component for pressure mapping.

A

Anonymous

Feb 01, 2026

Rating: 4/5

Durable film

The film feels sturdy. Bending radius is acceptable for most applications.

A

Anonymous

Jan 19, 2026

Rating: 5/5

Easy to use

The solder-free aspect saved me a lot of time. Plugged right into my breadboard adapter.

5 FAQ

Q: What is the maximum force before damage?

A: We recommend staying within 20 Newtons to ensure longevity.

Q: Are the leads removable?

A: The leads are integrated into the film structure and cannot be removed.

Q: Can this be used with Arduino?

A: Yes, it works with any microcontroller using an analog input pin.

Q: Is it waterproof?

A: The sensor is moisture resistant but not fully waterproof for submersion.

Q: Do you sell the connector separately?

A: Yes, please check our accessories section for matching FSR connectors.

Explore your interests

All Categories
Best Seller (30)
New List (30)
Children's Potty Training Seat for Boys and Girls, Toddler Toilet Trainer with Urinal Bucket

Children's Potty Training Seat for Boys and Girls, Toddler Toilet Trainer with Urinal Bucket

$17.90

265/70R17 AT Off-Road Tire, Also Available in 205/215/225/235/45/50/55/60R18/20 High-Performance Sizes for 19-inch Wheels

265/70R17 AT Off-Road Tire, Also Available in 205/215/225/235/45/50/55/60R18/20 High-Performance Sizes for 19-inch Wheels

$898.00

CANDLE.LAB | Silver Metal and Wood Wick Centering Device - DIY Tool for Aromatherapy Container Candles

CANDLE.LAB | Silver Metal and Wood Wick Centering Device - DIY Tool for Aromatherapy Container Candles

$2.50

Custom Solid Wood Plaque - Antique Style Wooden Storefront Sign, Door Plaque, Carved Wood Board with Arched Couplets

Custom Solid Wood Plaque - Antique Style Wooden Storefront Sign, Door Plaque, Carved Wood Board with Arched Couplets

$50.00

Industrial Scouring Pads - Stainless Steel Brushing and Rust Removal for Iron Plates - Heavy-Duty Kitchen Cleaning and Polishing

Industrial Scouring Pads - Stainless Steel Brushing and Rust Removal for Iron Plates - Heavy-Duty Kitchen Cleaning and Polishing

$17.62

Supply Fully Automatic Self-Cleaning Filter Pipeline Backwash Filtration Machine Stainless Steel Scraper Filter

Supply Fully Automatic Self-Cleaning Filter Pipeline Backwash Filtration Machine Stainless Steel Scraper Filter

$9,600.00

Fangxinyue Scented Candle Glass Windshield - High Borosilicate Cover to Improve Memory Ring Burning

Fangxinyue Scented Candle Glass Windshield - High Borosilicate Cover to Improve Memory Ring Burning

$29.90

Hanging Drainage Basket Kitchen Sink Strainer Plastic Storage Rack Food Waste Filter

Hanging Drainage Basket Kitchen Sink Strainer Plastic Storage Rack Food Waste Filter

$2.85

Over-Toilet Storage Cabinet with Doors - Multi-Tier Floor Standing Bathroom Organizer for Narrow Spaces

Over-Toilet Storage Cabinet with Doors - Multi-Tier Floor Standing Bathroom Organizer for Narrow Spaces

$258.00

Inth A6 Multifunctional Leather Journal - Vintage Sketchbook, Watercolor Pad, and Doodle Book with Replaceable Cotton Refill Pages for Students

Inth A6 Multifunctional Leather Journal - Vintage Sketchbook, Watercolor Pad, and Doodle Book with Replaceable Cotton Refill Pages for Students

$26.90

Beginner Chinese Painting Line Drawing Copybook: Animals, Flowers, Figures, and Landscapes

Beginner Chinese Painting Line Drawing Copybook: Animals, Flowers, Figures, and Landscapes

$18.80

vantkevin Scented Candle Tool Set for Extinguishing Flames and Snuffing Wicks

vantkevin Scented Candle Tool Set for Extinguishing Flames and Snuffing Wicks

$17.60

Multi-Function Car Tire Stone Remover Tool - Hook Pick and Screwdriver for Tread Cleaning

Multi-Function Car Tire Stone Remover Tool - Hook Pick and Screwdriver for Tread Cleaning

$3.80

Pad Printing Machine Parts: Fixed Ink Roller Screw, Steel Plate Mounting Screw, Blade Holder Adjustment Nut, Blade Clamp Screw

Pad Printing Machine Parts: Fixed Ink Roller Screw, Steel Plate Mounting Screw, Blade Holder Adjustment Nut, Blade Clamp Screw

$0.30

Cast Steel Speed Bump for Road Ramps and Slopes

Cast Steel Speed Bump for Road Ramps and Slopes

$104.12

Lifting Chain Rigging with Shackles and Hooks - Manganese Steel Chain for Towing and Hoisting Cargo 5 Ton, 3t, 2m, 1m

Lifting Chain Rigging with Shackles and Hooks - Manganese Steel Chain for Towing and Hoisting Cargo 5 Ton, 3t, 2m, 1m

$92.90

309 PCB Conformal Coating - Triple Protection Acrylic UV-Cured Moisture Resistant Paint by Dima

309 PCB Conformal Coating - Triple Protection Acrylic UV-Cured Moisture Resistant Paint by Dima

$462.50

Biliansheng Non-Shaven Hair Transplant and Follicle Detection Service for Men and Women

Biliansheng Non-Shaven Hair Transplant and Follicle Detection Service for Men and Women

$88.00

Mattel UNO Cards Desktop Happy Casual Party Multiplayer U-No Official Game Interactive Poker Cards

Mattel UNO Cards Desktop Happy Casual Party Multiplayer U-No Official Game Interactive Poker Cards

$22.90

Zero-Basis Electric Guitar Intro: 7-Week Self-Study Plan with Practice Exercises, Error Correction, and Materials

Zero-Basis Electric Guitar Intro: 7-Week Self-Study Plan with Practice Exercises, Error Correction, and Materials

$472.10

Hongxing Ink for Brush Calligraphy - Large Bottle Black Ink for Beginners, Students, and Traditional Chinese Painting (Light Glue, Ancient Formula, Soot-based)

Hongxing Ink for Brush Calligraphy - Large Bottle Black Ink for Beginners, Students, and Traditional Chinese Painting (Light Glue, Ancient Formula, Soot-based)

$5.78

Loose Aquamarine Beads - Gemstone Bracelet Components Including Amber, Southern Red Agate, Gold Rutilated Quartz, Ice-Grade Devil Blue Donghai Crystal

Loose Aquamarine Beads - Gemstone Bracelet Components Including Amber, Southern Red Agate, Gold Rutilated Quartz, Ice-Grade Devil Blue Donghai Crystal

$6.72

Mia Sketch Blending Stump Set for Highlights and Shadows, Professional Art Supplies Including Paper Blenders, Makeup Sponges, and Cotton Tips for Still Life Drawing

Mia Sketch Blending Stump Set for Highlights and Shadows, Professional Art Supplies Including Paper Blenders, Makeup Sponges, and Cotton Tips for Still Life Drawing

$4.00

Custom Tactical Waterproof and Shockproof Knife Box - EDC Carry Case for Folding Knives, Headphones, Data Cables, and Tools

Custom Tactical Waterproof and Shockproof Knife Box - EDC Carry Case for Folding Knives, Headphones, Data Cables, and Tools

$21.99

Wang Xizhi's Hundred-Rhyme Song of Cursive Script - Taipei Palace Museum Edition Hardcover High-Definition Replica Decorative Art Print

Wang Xizhi's Hundred-Rhyme Song of Cursive Script - Taipei Palace Museum Edition Hardcover High-Definition Replica Decorative Art Print

$32.90

Used Car Tires – Sizes: 205/55, 185/65 R15, 215/225/235, 195 R15/R16/R17/R18/R19

Used Car Tires – Sizes: 205/55, 185/65 R15, 215/225/235, 195 R15/R16/R17/R18/R19

$264.00

Variable Frequency Three-Phase Asynchronous Motor IFG-50-3-4

Variable Frequency Three-Phase Asynchronous Motor IFG-50-3-4

$3,299.00

Manual French Fry Cutter, Multi-Function Slicer for Radish, Cucumber, Potato, and Onion, Commercial Vegetable Chopper

Manual French Fry Cutter, Multi-Function Slicer for Radish, Cucumber, Potato, and Onion, Commercial Vegetable Chopper

$660.00

Multi-Function Water Cooler Bucket Storage Rack for Office, Large Capacity Floor-Standing Organizer

Multi-Function Water Cooler Bucket Storage Rack for Office, Large Capacity Floor-Standing Organizer

$119.64

401 Silicone-Specific Adhesive for Bonding Metal, Plastic, TPU, TPR, ABS; Silicone-to-Silicone Bonding Without Surface Treatment

401 Silicone-Specific Adhesive for Bonding Metal, Plastic, TPU, TPR, ABS; Silicone-to-Silicone Bonding Without Surface Treatment

$21.96